BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Acton Trails - ECPv5.12.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Acton Trails
X-ORIGINAL-URL:https://www.trails.actonma.gov
X-WR-CALDESC:Events for Acton Trails
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20170312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20171105T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20170521T093000
DTEND;TZID=America/New_York:20170521T150000
DTSTAMP:20260414T141222
CREATED:20170518T123607Z
LAST-MODIFIED:20170518T123607Z
UID:1073-1495359000-1495378800@www.trails.actonma.gov
SUMMARY:Assabet River Trail Bridge Construction Day 3
DESCRIPTION:Come join us for the construction of a new trail bridge on the Assabet River trail.\nThe 20′ bridge spans a small creek. \nStart time is 9:30 Items to accomplish. \n\n\n\nFinish the railings on the bridge\nClear far trail of small trees and brush\nDig and level sill and stringers for attached boardwalk\nInstall hangers and stringers on boardwalk to sill\nDeck boardwalk (ramp) to the bridge.\nLevel boardwalk to the trail\n\n\n\n\n \nLet me know if you can come. \nBring Water\, bug repellent and work gloves\, a battery powered hand drill if you have one. (long pants only please)
URL:https://www.trails.actonma.gov/event/assabet-river-trail-bridge-construction-day-3/
LOCATION:Assabet River Trail Bridge\, Acton Waste Water Treatment Plant on Adams Street\, Acton\, MA\, 01720\, United States
ORGANIZER;CN="Bruce%20Rachman":MAILTO:rachman0015@comcast.net
END:VEVENT
END:VCALENDAR