BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Acton Trails - ECPv5.12.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Acton Trails
X-ORIGINAL-URL:https://www.trails.actonma.gov
X-WR-CALDESC:Events for Acton Trails
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20170312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20171105T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20170506T093000
DTEND;TZID=America/New_York:20170506T140000
DTSTAMP:20260414T075129
CREATED:20170503T164800Z
LAST-MODIFIED:20170504T141712Z
UID:1065-1494063000-1494079200@www.trails.actonma.gov
SUMMARY:Assabet River Trail Bridge Construction
DESCRIPTION:Come join us for the construction of a new trail bridge on the Assabet River trail.\nThe 20′ bridge will span a small creek. \nThe first phase of the project digging the trail down for the sills is almost complete. On Saturday we will complete the sill installation\, and transport the stringers to the site.\nWe will install the stringers onto the sills and try to complete the railings and decking if possible. \nStart time is 9:30 cutting the railings and moving the sills into place. \nDrilling of the posts will also be done prior to moving the stringers into place. \nAn additional boardwalk will also be built after the bridge is complete. \nLet me know if you can come. \nBring Water\, bug repellent and work gloves. (long pants only please)
URL:https://www.trails.actonma.gov/event/assabet-river-trail-bridge-construction/
LOCATION:Assabet River Trail Bridge\, Acton Waste Water Treatment Plant on Adams Street\, Acton\, MA\, 01720\, United States
ORGANIZER;CN="Bruce%20Rachman":MAILTO:rachman0015@comcast.net
END:VEVENT
END:VCALENDAR